Two advanced chip factories called Terafab will be built by Tesla and Intel in Austin, Texas.

The factories will make AI chips to power cars, Optimus humanoid robots, AI satellites in space, and artificial intelligence data centers for Tesla and SpaceX.


Video Spotlight:  


This post is based on the Reuters article, Musk says SpaceX and Tesla to build advanced chip factories in Austin, by Joe Brock, March 22, 2026 (requires a subscription); the 24/7WallSt post, Elon’s Terafab Is Moving at “Light Speed” — and That Could Mean Big Things for Tesla, by Joey Frenette, May 3, 2026; and the YouTube video in the Spotlight. Image source: Joseph Marino / Alamy Stock Photo

Discussion Questions:

1. What is capacity planning? What are three types of capacity planning strategies?

Guidance: Capacity planning is about determining, measuring and adjusting an organization’s resources to meet changing product/service demand. There are three types of capacity planning strategies:

Leading: building capacity in anticipation of future demand increases.

Following: building capacity when demand exceeds current capacity.

Tracking: adding capacity in small increments to keep pace with increasing demand.

2. What type of capacity planning strategy is Tesla using with Terafab?

Guidance: Terafab is being used for a leading capacity strategy. The current global chip output meets only 3% of Tesla's future needs. Two new chip factories will provide the capacity required to meet the remaining 97% of the company’s future chip demand.

3. Illustrate the key inputs to capacity planning in the Terafab case.

Guidance: Demand forecasts are key inputs to capacity planning. Because demand for AI chips is expected to exceed chip supply, Tesla plans to build two chip factories in Austin, Texas, to enable enough supply for cars, robots, and data centers for Tesla and SpaceX.